PROGRAMS AND SERVICES
BUSINESS OUTREACH PROGRAM

UPCOMING CAPITAL CONSTRUCTION PROJECTS
Over $100,000 in Value
Services Needed for Each Project
July 2008

ROAD CONSTRUCTION / FLOOD CONTROL

Project Description Estimated
Value
$
Projected Advertisment
Date
Project
Location
Services Needed
ROAD CONSTRUCTION

Vasco Road Safety Improvements

21,000,000 7/08 Livermore

Trucking, Small Concrete Structure, Grading & Paving, Traffic Control, Traffic Striping, Electrical, Landscaping

Foothill Blvd./Mattox Rd. – Median Island Improvement

400,000 9/08 Castro Valley

Concrete Flat Work, Grading & Paving, Traffic Control, Traffic Striping, Electrical

166th Avenue Retaining Wall

160,000 10/08 Castro Valley

Trucking, Small Concrete Structure, Structure Concrete/Masonry, Grading & Paving, Traffic Control

159th Avenue Sidewalk

230,000 11/08 Ashland

Concrete Flat Work, Grading & Paving, Traffic Control

Bridge Seismic Retrofit

1,500,000 11/08 Various

Iron Work, Traffic Control, Electrical

Eden Canyon MM 2.03

1,300,000 12/08 Castro Valley

Trucking, Structure Concrete/Masonry, Grading & Paving, Traffic Control, Traffic Striping

Palomares Road MM 8.7

230,000 12/08 Castro Valley

Traffic Control, Traffic Striping

Palomares Road MM 8.94

270,000 12/08 Castro Valley

Trucking, Structure Concrete/Masonry, Grading & Paving, Traffic Control, Traffic Striping

Culvert

150,000 TBD Various

Small Concrete Structure, Traffic Control

Orange Avenue Sidewalk

250,000 TBD Castro Valley

Trucking, Small Concrete Structure, Concrete Flat Work, Grading & Paving, Traffic Control, Traffic Striping

Sidewalk Improvements

1,500,000 TBD Various

Trucking, Small Concrete Structure, Concrete Flat Work, Grading & Paving, Traffic Control, Traffic Striping



Project Description Estimated Value $ Projected Advertisment Date Project
Location
Services Needed
FLOOD CONTROL

Zone 2, San Lorenzo Creek Trail Improvement

220,000 10/08 Hayward

Trucking, Small Concrete Structure, Concrete Flat Work, Structure Concrete/Masonry, Traffic Control

Zone 6, Lines N, N-1 Desilting

1,400,000 10/08 Fremont

Trucking, Grading & Paving

Zone 3A, Line A Desilting Between UPRR and Tidegate

2,400,000 2/09 Hayward

Trucking, Grading & Paving

Zone 6, Line E Embankment Erosion Repair

150,000 2/09 Fremont

Trucking, Grading & Paving

Zone 13, Line P, Hazardous Trees Removal and Restoration

1,000,000 2/09 San Leandro

Trucking, Landscaping

Zone 2, Line G-8 Bypass Along Almond Road and Christensen Lane

400,000 3/09 Castro Valley

Trucking, Small Concrete Structure, Grading & Paving, Iron Work, Traffic Control, Underground Construction

Zone 5, Line P Desilting Between Patterson Ranch and Tupeldo

1,000,000 3/09 Fremont

Trucking, Grading & Paving

Zone 3A, Line D Upstream of Line A to Huntwood

870,000 4/09 Hayward

Trucking, Small Concrete Structure, Structure Concrete/Masonry, Grading & Paving, Iron Work

Zone 3A, Line A-5 Near Bunting Street

600,000 4/09 Hayward

Trucking, Small Concrete Structure, Structure Concrete/Masonry, Grading & Paving, Iron Work, Underground Construction

Zone 5, Line D, Farwell Drive Crossing

600,000 4/09 Fremont

Trucking, Small Concrete Structure, Structure Concrete/Masonry, Grading & Paving, Iron Work, Traffic Control, Traffic Striping, Underground Construction

Zone 5, Line D, Cherry Street Crossing

500,000 4/09 Newark

Trucking, Small Concrete Structure, Structure Concrete/Masonry, Grading & Paving, Iron Work, Traffic Control, Traffic Striping, Underground Construction

Zone 12, Line S, Storm Drain Bypass Along 62nd and 64th Streets

3,500,000 6/09 Emeryville

Trucking, Small Concrete Structure, Structure Concrete/Masonry, Grading & Paving, Iron Work, Traffic Control, Traffic Striping, Underground Construction