Fees Required for Permits:

Beginning July 1, 2009 the following fees shall apply:
Work Type Cost
A permit to construct, rehabilitate, or destroy wells including Water Supply Wells, Cathodic Protection/Anode Wells, all types of Monitoring Wells, Piezometer/Inclinometer/Seismic Monitoring Wells, Geothermal Heat Pump-Construction. $397.00 per well
A permit to bore exploratory holes, including Contamination Study, Environmental/Monitoring Study, Geotechnical Study, CPT's, Direct Push Sampling.

Construction and destruction of any types of remediation systems, including vapor probes/vapor points for sampling, vapor injection/extraction boreholes or remediation wells, sparge wells, recharge wells.
$265 per site *
* A site includes the project parcel as well as any adjoining parcels as long as it is the same property owner.
Permit Fees are exempt to State & Federal Projects.
Applicants shall submit a letter from the agency requesting the fee exemption.